Start with the show’s own instructions

The organizer’s exhibitor manual defines the process for this particular show. Share it with the production team alongside the booth drawing. Seattle Convention Center also provides an exhibitor services portal; use the current official information for ordering and deadlines rather than copying a schedule from another event.

Coordinate electrical requirements

Seattle Convention Center identifies Edlen Electrical as its exclusive electrical and utility service provider for exhibitors and show management. Give the approved equipment requirements to the appropriate ordering contact. A production plan is not an electrical order, and submitting one does not automatically complete the other.

Keep one current plan

Record the approved station position, equipment list and service orders together. If the booth changes after approval, update the crew and the venue contacts. Keep access instructions and on-site contact details available to the people actually arriving with the equipment.

Illustrative planning scenario

Example: equipment changes after a service order

The production scope adds equipment after the exhibitor places an electrical order. Tell the ordering contact and review the revised requirement with the venue provider. Do not assume the existing order covers an expanded setup just because the booth dimensions are unchanged.

A working decision sheet

Keep the venue and show documents linked in the brief rather than copying old instructions into a permanent checklist. Ordering processes and deadlines can change between events. The table below assigns questions to an owner; it does not replace the organizer’s current manual or a provider’s technical review. Merch Troop is not presented here as the venue or its exclusive utility contractor.

Decision sheet: Prepare the venue services before show week
DecisionRecord or reviewPlanning note / owner
Show requirementsCurrent exhibitor manual and organizer contactExhibitor / agency
ElectricalApproved equipment requirement and order statusExhibitor with the designated provider
AccessMove-in schedule, loading process and crew badgesOrganizer / venue contact
Station layoutWorking area, inventory and guest flowExhibitor and production team

Put it into your brief

  • Where is the current show manual and services portal?
  • Who is responsible for submitting the electrical order?
  • Have layout or equipment changes been communicated to every affected team?

Use these questions to record the decisions you already know and identify what needs review. Keep the brief with the current product specifications and event documents.

Current venue resources

Confirm details directly with the venue and show organizer.